Preparation
Client Checklist
What needs to be ready on site. Clear guidelines for pre-installation, electrical, site readiness, and system integration.
C L I E N T C H E C K L I S T
Installation Preparation Steps
01
Pre-Installation
- Wall or frame construction completed
- Mounting surface prepared
- Level confirmation
02
Electrical & Data
- Electrical service routed to the TV location
- Data/Ethernet cable installed to the TV location
- Dedicated circuits installed per system requirements
Recommended Power Requirements (subject to site conditions):
YOLO TV: 240V dedicated — Two 2-Pole 20A
Total maximum load: 5,950 W (distributed evenly)
Final circuit sizing, conductor sizing, and protection to be determined by a licensed electrician per local code.
03
Site Readiness
- Clear and unobstructed access to the installation area
- TV crates and staging area must be within 25 ft of installation location
- Coordination of shipping from the designated YOLO TV warehouse
- Offloading of the YOLO TV from the delivery truck
04
System Integration
- Connection to network
- Audio / sound system integration (if applicable)
05
Connection & Set-Up
- System connected to existing power and data infrastructure
- Peace of Mind Kit stored safely for future maintenance and replacement parts
E X C L U S I O N S
NOT Included
NOT Included unless explicitly stated:
- Electrical work
- Structural construction
- Audio systems
- Network setup
- Permits
- Landscaping / site modifications
- Delivery to the client's address
Site Readiness Notice
Site readiness must be confirmed in writing prior to technician dispatch. Delays caused by site unpreparedness will be billed at $275/hr plus travel costs.