Preparation

Client Checklist

What needs to be ready on site. Clear guidelines for pre-installation, electrical, site readiness, and system integration.

C L I E N T   C H E C K L I S T

Installation Preparation Steps

01

Pre-Installation

  • Wall or frame construction completed
  • Mounting surface prepared
  • Level confirmation
02

Electrical & Data

  • Electrical service routed to the TV location
  • Data/Ethernet cable installed to the TV location
  • Dedicated circuits installed per system requirements
Recommended Power Requirements (subject to site conditions):

YOLO TV: 240V dedicated — Two 2-Pole 20A

Total maximum load: 5,950 W (distributed evenly)

Final circuit sizing, conductor sizing, and protection to be determined by a licensed electrician per local code.

03

Site Readiness

  • Clear and unobstructed access to the installation area
  • TV crates and staging area must be within 25 ft of installation location
  • Coordination of shipping from the designated YOLO TV warehouse
  • Offloading of the YOLO TV from the delivery truck
04

System Integration

  • Connection to network
  • Audio / sound system integration (if applicable)
05

Connection & Set-Up

  • System connected to existing power and data infrastructure
  • Peace of Mind Kit stored safely for future maintenance and replacement parts

E X C L U S I O N S

NOT Included

NOT Included unless explicitly stated:

  • Electrical work
  • Structural construction
  • Audio systems
  • Network setup
  • Permits
  • Landscaping / site modifications
  • Delivery to the client's address

Site Readiness Notice

Site readiness must be confirmed in writing prior to technician dispatch. Delays caused by site unpreparedness will be billed at $275/hr plus travel costs.

Ready to move forward?

Accept and sign your proposal to begin production.

Accept & Sign Proposal