Documents
Project Documents
Everything you need for your YOLO TV project — proposal, warranty, drawings, subcontractor guide, site prep checklist, and team contacts — all in one secure location.
Proposal Documents
Documents specific to your proposal and project configuration.
Full Proposal — YT-2026-0417
Complete proposal: system specs, pricing, scope, installation, timeline & warranty.
Terms & Conditions
Full sale terms — deposit, scope, warranty, permits, changes, cancellation & liability.
Proposal — YT-2026-0417
Full proposal document with scope and terms.
YOLO Pro Series Spec Sheet
Detailed product specifications and ratings.
Rise & Rotate Vault Requirements
Vault dimensions, drainage, and structural requirements.
Electrical Requirements
Power, circuit, and raceway requirements.
Installation Drawings
Mounting and layout drawings for your site.
Site Renderings
Photorealistic renderings of the installed system.
Warranty Terms
Current approved YOLO TV warranty terms.
Terms & Conditions
Sale terms, deposit, and payment schedule.
Project Resource Library
Approved reference documents to guide your builder, GC, and trades through installation prep.
Warranty & Service Terms
Five Year Transferable Parts Warranty — full legal terms and conditions.
Installation Drawings Index
Index of mounting, layout, and structural drawings for your project.
Subcontractor Guide
Scope boundaries and responsibilities for trades working alongside YOLO TV.
Client Checklist & Site Preparation
C L I E N T C H E C K L I S T — 5-step site readiness and installation requirements.
Team Contact Information
Direct contacts for your YOLO TV project team.
Your YOLO TV Team
Direct contacts for every stage of your project. Always reference your proposal ID when reaching out.
